CTOs on the Move

Williston Basin Interstate Pipeline Company

www.wbip.com

 
Williston Basin Interstate Pipeline Company is a Bismarck, ND-based company in the Energy and Utilities sector.
  • Number of Employees: 100-250
  • Annual Revenue: $500M-1 Billion
  • www.wbip.com
  • 1250 W Century Ave
    Bismarck, ND USA 58503
  • Phone: 701.530.1600

Executives

Name Title Contact Details

Similar Companies

Athena Energy Services

Athena Energy Services inc. is a Gatineau, QC-based company in the Energy and Utilities sector.

Sun Catalytix Corporation

Sun Catalytix is a seed-stage start-up spun out of MIT to commercialize recent water-splitting discoveries coming out of the labs of MIT Chemistry Professor Daniel Nocera.

Global Common

Global Common is a Garden City, NY-based company in the Energy and Utilities sector.

Hyperdynamics

Hyperdynamics Corporation, an independent oil and gas exploration company, is engaged in the acquisition, exploration, and development of oil and gas properties in the Republic of Guinea, Northwest Africa. It owns a 37% working interest in a concession that covers an area of approximately 9,650 square miles in offshore Guinea. The company was founded in 1983 and is headquartered in Houston, Texas.

Orca Exploration

Orca Exploration Group Inc. operates the 879 Bcf Songo Songo natural gas field under a Production Sharing Agreement (PSA) with the Tanzania Petroleum Development Corporation (TDPC). 195 Bcf is allocated for use by Songas Limited and 684 Bcf is produced, marketed and sold by Orca Exploration. The license has a total area of approximately 41,630 acres (170 km2). The blocks are located in shallow water approximately 15 kilometres off the coast and 200 kilometres south of Dar es Salaam. The licenswell heade contains the large Songo Songo gas field which is positioned on and slightly offshore Songo Songo Island. The main reservoir is developed in Lower Cretaceous aged Neocomian to Albian sandstones (Neocomian), while Upper Cretaceous aged Cenomanian sands that lie unconformably on the Lower Cretaceous provide additional reservoir when developed. Orca operates a gas processing facility on Songo Songo Island on behalf of Songas Limited, the gas processing facility owner, on a no loss, no gain basis. The plant supplies natural gas to a 25 km 12” marine pipeline and a 207 km 16” land pipeline that extends north along the coast to Dar es Salaam. Songo Songo is Tanzania’s first natural gas development.