CTOs on the Move

Sage Parts Plus Inc

www.sagepartsplus.com

 
Sage Parts Plus Inc is a Atlanta, GA-based company in the Agriculture and Mining sector.
  • Number of Employees: 100-250
  • Annual Revenue: $10-50 Million

Executives

Name Title Contact Details

Similar Companies

Peninsula Orchid Society

Peninsula Orchid Society is a San Mateo, CA-based company in the Agriculture and Mining sector.

western lithium corp

western lithium corp is a Vancouver, BC-based company in the Agriculture and Mining sector.

CRU Group

CRU offers unrivalled business intelligence on the global metals, mining and fertilizer industries through market analysis, price assessments, consultancy and events.

Phoscan

PhosCan Chemical Corp. is a Toronto Stock Exchange-listed company which is engaged in the development of the Martison Phosphate Project. The Company’s wholly-owned Martison Phosphate Deposit is located 70 kilometres north of Hearst, Ontario and has ready access to excellent infrastructure including rail, power and labour. HISTORY -- In 2006, the Company set out a path to examine the development of the Martison Phosphate Project as a vertically - integrated phosphate fertilizer producer. Under this development scenario, the Project was envisioned to consist of the Martison Phosphate Deposit and a planned phosphate mine, beneficiation plant, conversion complex and solid fertilizer production facility. Phosphate ore from the mine was to be processed into a concentrate in the beneficiation plant. The concentrate was to be transported by slurry pipeline to a conversion complex near Hearst where it was to be combined with sulphuric acid to produce phosphoric acid. Sulphuric acid was expected to be sourced either from existing nearby base metal smelters or a sulphuric acid plant which was to be built by the Company as part of the conversion complex. PhosCan was to further process the phosphoric acid into superphosphoric acid (SPA) and/or mono-ammonium phosphate (MAP) fertilizer which was to be sold to fertilizer dealers serving the agricultural regions of western Canada and mid-western United States. In May 2008, PhosCan received the results of a Pre-Feasibility Study of the Martison Phosphate Project as a vertically - integrated phosphate fertilizer producer which concluded that the Company should proceed immediately with a Bankable Feasibility Study of the Project. The Pre-Feasibility Study is summarized in an N.I. 43-101 compliant technical report entitled Martison Phosphate Project Preliminary Feasibility Study dated May 16, 2008, which may be found in the Investor Relations section of the website under the sub-heading Technical Reports or on SEDAR (www.sedar.com). PhosCan commenced a Bankable Feasibility Study during the winter 2008 field program with the completion of the following: a geotechnical program on the proposed mine pit and infrastructure areas; collection of a 40 tonne bulk sample for metallurgical testing and final beneficiation plant design; and a hydrogeological program examining water flows within the proposed mine pit area. During the balance of the year, the Company also completed several activities, including: an upgrade of the Fox River crossing and the existing Fushimi Road (completed by a construction company in a joint venture with a local First Nation); archaeological, traditional native land use and occupancy, and biological studies; purchase of a portion of the land required for the proposed MAP granulation plant in Brandon, Manitoba; and preliminary site layout and process flow diagrams and design criteria for the proposed MAP granulation plant and a portion of the proposed conversion complex. On December 8, 2008, PhosCan announced that, in light of current financial market and fertilizer industry conditions, it was deferring several tasks related to the development of the Martison Phosphate Project such as construction of the balance of the permanent road to access the proposed mine site and detailed engineering. As a result, PhosCan no longer expects production to begin at the Project in 2012 as previously announced. Throughout 2009, the Company remained prudent and disciplined as it worked to find the right balance between advancing the Martison Phosphate Project and preserving its cash. In that regard, the following activities were planned and executed under a reduced work program: Class C - Environmental Assessment of the permanent access road extension, permitting, geophysics at the proposed mine site, taking mine claims to lease, and pilot plant-level ore beneficiation tests utilizing the 40 tonne bulk sample. The pilot plant tests continued though out 2009 and 2010. During 2010, several developments have led the Company to consider a revised development plan for the Martison Phosphate Project as a stand-alone phosphate concentrate (phosrock) producer. Specifically with respect to the Project, these include: the pilot plant work which indicated that niobium contained in the Martison Phosphate Deposit could potentially be recovered, thereby adding a second revenue source; and the significantly reduced capital expenditures required to develop a stand-alone phosrock producer versus a vertically - integrated phosphate fertilizer producer. Within the phosphate fertilizer industry, the developments include: an improvement in phosphate fertilizer prices; permitting issues in the major phosphate-producing states of Florida and Idaho, which have contributed to a continued decline in phosrock production in North America; the expected closure in 2013-2014 of Agrium Inc.’s phosrock mine in Kapuskasing, Ontario; and the sale by Vale S.A. of minority interests in the Bayóvar phosphate mine project to the Mosaic Company and Mitsui & Co. Ltd., thereby removing a significant new near-term source of merchant phosrock supply from the market.

Energizer Resources

Energizer Resources (TSX:EGZ, OTCQZ:ENZR) is a mineral exploration and mine development company based in Toronto, Canada, that is developing its 100%-owned, flagship Molo Graphite Project in southern Madagascar. The Molo Graphite Project is one of the largest primary sources of crystalline flake graphite in the world. The Molo Project hosts a NI 43-101 compliant indicated mineral resource of 84.04 million tonnes grading 6.36% carbon (Cg) and an inferred resource grading 6.29% Cg of crystalline flake graphite. The Company released a robust Preliminary Economic Assessment Study of the Molo in February 2013, resulting in a NPV at 10% discount of US$421 million, a 48% pre-tax IRR and a 3-year payback. Energizer has initiated a Full Feasibility Study (FS) which is expected to be released to the market by Q4 2014. Results of the Company`s recently completed pilot plant operation confirmed that 43.5% of the Molo deposit is classified as premium-priced large and extra-large flake, with an average purity level in excess of 97% carbon. Energizer is targeting full-scale production by Q2 2016.