CTOs on the Move

City of Asheville

www.ashevillenc.gov

 
The City of Asheville is committed to being the employer of choice in the region and the best local government in North Carolina. If you are a seasoned professional or just beginning your career, we encourage you to join our team. The largest city in Western North Carolina and the 11th largest city in the state, Asheville is the county seat of Buncombe County with a diverse population of more than 84,000. Asheville was named one of “25 Best Places for Business and Careers” by Forbes.com. “Our Quality of Service, Your Quality of Life” is what we believe at the ...
  • Number of Employees: 1K-5K
  • Annual Revenue: $50-100 Million

Executives

Name Title Contact Details
Holly Barham
Deputy Chief Information Officer Profile
Holly Barham
Director of Information Technology Services Profile

Similar Companies

California Country

California Country is a Sacramento, CA-based company in the Government sector.

City of Long Beach

Long Beach is a city in Los Angeles County in Southern California, on the Pacific coast of the United States. The city is the 36th-largest city in the United States and the seventh-largest in California. As of 2010, its population was 462,257.

The County of Bruce

Bruce County is a county in Southwestern Ontario, Canada comprising eight lower-tier municipalities and with a 2016 population of 66,491.

Oak Forest, Illinois

Oak Forest, Illinois is a Oak Forest, IL-based company in the Government sector.

City of Haverhill

Water Maintenance is responsible for operating, maintaining and repairing the water distribution system; installing new water mains, implementing the backflow prevention program; reviewing plans for new water mains and services; approving new water service applications; and maintaining records of the distribution system. The distribution system is the network of pipes and the associated fittings, valves, hydrants and appurtenances that transports water throughout the City. Most of the distribution system is located within the city street right-of-ways. A small percentage is located in cross-country easements. Water is pumped into the distribution system from the water treatment plant on Kenoza Lake. The distribution system includes approximately 235 miles of pipe that range in size from 2-inch up to 36-inch. Pipe materials include unlined cast iron, lined cast iron, ductile iron, transite, and PVC. Pressures and storage throughout the system are maintained by three concrete storage tanks and 5 booster pumping stations throughout the City. The pumping stations operate to fill storage tanks and/or pressurize separate high pressure zones.