| Name | Title | Contact Details |
|---|
EOC Limited ("EOC", "Group" or "Company"), is an established owner and operator of floating production, storage and offloading vessels ("FPSO"), a provider of offshore construction and installation services and a lessor of construction support vessels. We add value throughout the post-exploration phases of offshore oil and gas fields' life cycle. This covers various activities ranging from the installation of field infrastructure to the provision and operation of production assets, oil field maintenance services and field abandonment support services. Our operational footprint stretches from the Republic of Congo (Africa) in the West to Australia in the East, and we have significant experience in operating across key regions of Exploration and Production ("E&P") in Asia, including in Brunei, India, Indonesia, Malaysia, the Middle East, the Philippines, Vietnam and Thailand. Our core capabilities are in two focused business segments, namely: • Offshore Production ("Production") • Offshore Construction ("Construction")
IO Lighting is a Vernon Hills, IL-based company in the Energy and Utilities sector.
Petro-Hunt, L.L.C. is one of the leading companies in the Energy and Utilities sector.
Stress Engineering Services is an independent, employee-owned consulting engineering firm headquartered in Houston, Texas. In addition, we have offices located in Cincinnati, New Orleans, and Chicago. Our Houston and Cincinnati facilities feature
Eureka Midstream is an independent midstream energy company engaged in the gathering, transportation, and compression of natural gas. Our core business operations and strategic assets are located in the Appalachian basin, serving the prolific Marcellus and Utica shale plays. In 2003, Eureka Midstream, through Triad Energy, an oil and natural gas producer, purchased 182 miles of strategic rights of way in Ohio and Pennsylvania. The strategic right of ways enabled Eureka Midstream to plan, develop and build a high-quality gathering system, the maximum allowable operating pressure within a system at a fraction of the cost. In turn, we have been able to pass along much of the savings to our valued clients. With approximately 200 miles throughout the heart of the Marcellus and Utica natural gas shales, our advanced pipeline network is capable of transporting, lean or rich natural gas. This approach, a hybrid approach, is quite different from a typical midstream system. A typical midstream system runs on a dedicated drive, which transports only one form of hydrocarbon. The Eureka Midstream hybrid system provides today`s producer with increased flexibility at a reduced cost. While many operators are starting to develop and adopt a pipeline systems capable of transporting wet or dry natural gas, Eureka Midstream was among the first companies to standardize this approach. Innovation did not end with the introduction of the hybrid system. Eureka Midstream was also one of the first companies to introduce a system with multiple interconnects. The multi-interconnect system provides increased access to multiple gas processing options and interstate pipelines. This provides the producer with increased optionality, or the ability to identify and target better price points along the system.