CTOs on the Move


 
Acuva builds UV-LED water purification systems ideal for RVs, boats and homes. We believe that everyone should have access to safe drinking water that is convenient and environmentally friendly. Welcome to the future of water purification.
  • Number of Employees: 25-100
  • Annual Revenue: $1-10 Million
  • www.acuvatech.com
  • 887, Great Northern Way
    Vancouver, BC CAN V5T 4T5
  • Phone: 800.952.5210

Executives

Name Title Contact Details

Similar Companies

MMA Renewable Ventures

MMA Renewable Ventures is a Baltimore, MD-based company in the Energy and Utilities sector.

ATC Group Services

ATC provides integrated environmental consulting and engineering services from more than 100 locations nationwide.

Green Places

We believe being a green workplace is an ROI Positive decision for small businesses, but many don’t do it because of the false perception that it’s hard, complicated, and unprofitable.

Environmental Business International

Environmental Business International Inc. is a San Diego, CA-based company in the Energy and Utilities sector.

Westwater Resources

Westwater Resources Inc. (NYSE American: WWR) is focused on developing battery-anode natural graphite materials for advanced batteries. The Company`s primary project is the Kellyton graphite processing plant that is under construction near Kellyton, Alabama. The Kellyton graphite processing plant, using a patent pending purification method, will process raw flake graphite into battery-anode natural graphite materials for batteries that are used in electric vehicles, clean energy storage, electronics, and many other products. In addition, Westwater`s Coosa graphite deposit is the most advanced natural flake graphite deposit in the contiguous United States – located across 41,900 acres (~17,000 hectares) in Coosa County, Alabama, approximately 30-miles west of the Kellyton Plant. The Company began an exploration project in April 2021 to define the size and extent of both graphite and vanadium mineral concentrations at the Coosa graphite deposit and expects to complete a technical study over during 2022, with planned mining operations to begin in 2028.